Sydney Airport Message Board

Sydney Airport Message Board (http://www.yssyforum.net/board/index.php)
-   International Industry (http://www.yssyforum.net/board/forumdisplay.php?f=4)
-   -   787 First Flight Delayed (http://www.yssyforum.net/board/showthread.php?t=1847)

Saj_A 5th November 2008 05:16 AM

787 First Flight Delayed
 
This is breaking news, and I will update on my site as I get more info from Boeing.

Click

Mike W 5th November 2008 07:05 AM

Good grief. This is becoming as farcical as the 380. I expected more from Boeing and this fastener thing, what's the go there? Has less than a tradtionally built airliner yet this is not the first time it's caused issues.

I wouldn't be surprised if there is more to this and not the union strike either. :confused:

Saj_A 7th November 2008 02:10 PM

Well, things are going to get worse.

The 737 line has an issue only just now admitted by Boeing.

Quote:

It has to do with a tiny part on the 737 line known as a nutplate. Nutplates are very small metallic strips with holes at either end, from which bolts are inserted to hold together components within the airplane.

The nutplates are installed by major supplier Spirit Aerosystems in Wichita, Kansas. The issue is being described a quality assurance non-conformity issue. This was apparently discovered by Spirit employees.

The anomaly pertains to a protective finishing on these nutplates that prevent corrosion. Some of these small plates have been manufactured incorrectly and are deemed “unusable” according to one Boeing Renton employee.


All times are GMT +10. The time now is 05:38 AM.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright © Sydney Airport Message Board 1997-2022