View Single Post
  #24  
Old 30th April 2008, 05:44 PM
Kurt A Kurt A is offline
YSSY Forum Administrator
 
Join Date: Mar 2008
Location: YSSY
Posts: 958
Default Boeing Moves 787 Dreamliner to structural test rig

Quote:
Boeing moved the 787 Dreamliner static test airframe from its Final Assembly facility in Everett to its structural test rig on Friday. The test rig is located only 1,000 feet away from Final Assembly at the Everett factory.

The final stages of assembly to be completed on the static airframe will be finished concurrently with test set-up which is expected to begin immediately. Test will begin this summer.

"During static tests we apply loads to the airplane structure that simulate both normal operation as well as extreme flight conditions," said Randy Harley, vice president of Engineering & Technology for the 787 program. "We monitor the airplane to confirm analytical predictions and make sure the structure holds up to these conditions."

Movement of the static airframe clears the way to begin assembly of the third 787 to enter the flight test program. Most pieces of the third airplane arrived in Everett earlier this month. All assemblies for Airplane number three are now in Everett, and the airplane will be loaded into the first position of Final Assembly early next week.
-eTravel
__________________
YSSY Forum Administrator
Reply With Quote