Quote:
Originally Posted by Rhys Xanthis
And it failed!
|
It primarily failed due to payload limitations ex OOL (due to the short runway). Now that it has been extended I'm sure these restrictions would be far less severe.
The E190 would be stretched to operate OOL-PER, especially in winter with a full payload.