View Single Post
  #124  
Old 17th March 2022, 01:14 PM
Peter C Peter C is offline
Member
 
Join Date: Aug 2019
Location: WA
Posts: 243
Default

Quote:
Originally Posted by Max C View Post
It would have been dispatched with a permissible unserviceability and FL260 would be a restriction on that. The track would suggest they needed to remain clear of any icing conditions.
The mechanics in Melbourne did a quick job, as ZNB was on its way to London via Darwin within 24 hours. As I write, due at LHR in 3 hours.
Reply With Quote