View Single Post
  #4  
Old 27th November 2022, 04:31 PM
David Knudsen David Knudsen is offline
Administrator
 
Join Date: Mar 2008
Location: Brisbane
Posts: 714
Default

A bit scaled back from the 2014 Master Plan that had the terminal extending right around to the new runway along with a monorail to connect them all. I seem to recall some earlier Master Plans included extending the current domestic terminal into a full horseshoe shape and becoming a combined intl/domestic terminal, with the current ITB becoming a logistics terminal.
Attached Images
File Type: jpg BNE2014.jpg (65.1 KB, 22 views)
__________________
- Dave

Jetphotos.net Shots
Airliners.net Shots
Reply With Quote