Default

Nigel,

They can resheet the entire length of 34L in one or two nights? and have it ready for ops the next day?
Reply With Quote
  #12  
Old 10th February 2010, 01:01 AM
Nigel C Nigel C is offline
Prolific Member
 
Join Date: Mar 2008
Location: The farm
Posts: 4,022
Default

One or two nights??? 45m wide x ~4km long??? No chance!!!!

Ignoring the need to replace the lighting (runway edge and taxiway lead-out lighting), the first night is typically just profiling or milling the surface layer of the asphalt for maybe a couple of hundred metres. There might be some paving or laying of new asphalt, but the paving crew can only go as far as the milled section. Any painted markings removed by the profiler must be replaced by the end of the night.

Each night after that the paving crew will lay the new surface over the stuff that was milled the night before, and the profilers (3 at a time) will prepare the surface for the next night. They might lay 250-300m of new asphalt in a night, using up to 3 'shuttle buggies' connected to 3 pavers (+1 on site usually as a spare). Again, all painted markings must be replaced.

The runway has to be serviceable for the first arrival, so all debris has to be removed. There might be 3 or 4 street sweepers operating at the same time.

Total time for just resheeting the runway might be 2-3 weeks without any rain delay, but then there's the lighting to be reinstated and that can take possibly months to completely restore. Grooving the runway takes place ~6 weeks after the new asphalt has gone down, and that's a loooong sloooow process.
The available reduced length runway configurations the freighters require during curfew may also dictate what days the work can be restricted to, so the process could be dragged out a fair bit longer.

I hope this helps.



Pictures added in case you're not familiar with the jargon...
Profiler

Paver

Shuttle Buggy
__________________
I am always hungry for a DoG Steak! :-)
Reply With Quote
  #13  
Old 10th February 2010, 10:38 AM
Philip Argy's Avatar
Philip Argy Philip Argy is offline
Senior Member
 
Join Date: May 2008
Location: North Strathfield
Posts: 1,402
Question More work on 34L?

I see that 34L is being taken out of action again early this afternoon for departures - is that connected with last night's work?

Will the restriction to 34R disrupt any schedules for a/c that need more available takeoff length or can't perform the tight right turn after takeoff (or will they be allowed to overfly the City)?
__________________
Philip
Reply With Quote
  #14  
Old 10th February 2010, 04:48 PM
NickN NickN is offline
Senior Member
 
Join Date: Mar 2008
Posts: 1,394
Default

Nigel, love the info thanks!

How often do the runways require resheeting?
Reply With Quote
  #15  
Old 10th February 2010, 05:09 PM
Nigel C Nigel C is offline
Prolific Member
 
Join Date: Mar 2008
Location: The farm
Posts: 4,022
Default

Thankfully not very often! Maybe once every 10 years for a full resheet, longer if the pavement holds up.
__________________
I am always hungry for a DoG Steak! :-)
Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +10. The time now is 10:14 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright © Sydney Airport Message Board 1997-2022
Use of this web site constitutes acceptance of the Conditions of Use and Privacy Statement