Sydney Airport Message Board Sydney Airport Message Board  

Go Back   Sydney Airport Message Board > Aviation Industry News and Discussion > Australia and New Zealand Industry
Register FAQ Calendar Today's Posts Search


Reply
 
Thread Tools Search this Thread Display Modes
  #111  
Old 19th October 2017, 11:02 AM
Greg Hyde Greg Hyde is offline
Prolific Member
 
Join Date: Sep 2008
Posts: 4,915
Default

Wouldn't it depend on when the next maintenance is due ?
Reply With Quote
  #112  
Old 19th October 2017, 12:15 PM
Rowan McKeever Rowan McKeever is offline
Senior Member
 
Join Date: Aug 2011
Posts: 1,681
Default

I would've thought it would depend more on when the next repaint was due. Considering none of the remaining VYx series have been repainted since delivery in January 2006 (VYL; earlier, obviously, for the others) and VZR not since delivery in August 2011, I (like most of us) would have expected the VYx then VZA-VZE and ZQx to be done before the likes of VZR.

Perhaps this says something of the quality of the paintwork and finish on the respective deliveries.
Reply With Quote
  #113  
Old 19th October 2017, 02:50 PM
Greg Hyde Greg Hyde is offline
Prolific Member
 
Join Date: Sep 2008
Posts: 4,915
Default

Has any gone to SIN for a repaint without maintenance ?

Also, they are one a/c down with VZZ grounded in Sydney.
Reply With Quote
  #114  
Old 19th October 2017, 03:12 PM
Rowan McKeever Rowan McKeever is offline
Senior Member
 
Join Date: Aug 2011
Posts: 1,681
Default

As far as I know, all the ones that have been repainted in Singapore have only been repainted in Singapore (i.e. no other maintenance work).

It's also my understanding that VZZ is having its WiFi installation done while awaiting repairs, which means at least for the first week or so the network isn't really 'one down' as such.
Reply With Quote
  #115  
Old 19th October 2017, 05:03 PM
Greg Hyde Greg Hyde is offline
Prolific Member
 
Join Date: Sep 2008
Posts: 4,915
Default

Sorry Rowan, My mistake.

I'm surprised that they are taking a/c out just for a repaint rather than timing it with other tasks (maintenance).
Reply With Quote
  #116  
Old 19th October 2017, 05:42 PM
Fred C Fred C is offline
Member
 
Join Date: Jun 2009
Location: Sydney
Posts: 485
Default

It is very hard to maintain an aircraft while it is being painted.

Engineers don't like breathing spray paint and painters don't want engineers in the way.

It is hard to do any work whilst it is covered in brown paper and masking tape.

So planes get painted without any maintenance.
__________________
Regards,

Fred
Reply With Quote
  #117  
Old 19th October 2017, 06:06 PM
Rowan McKeever Rowan McKeever is offline
Senior Member
 
Join Date: Aug 2011
Posts: 1,681
Default

Technically, repainting is maintenance in that it prevents rusting and other types of damage to the airframe, as well as optimising the aerodynamics and fuel efficiency of the aircraft. As Fred says, though, quite hard to do a repaint concurrently with other maintenance (though, often, an aircraft will be programmed to have a maintenance check with a repaint following straight after, or vice versa).
Reply With Quote
  #118  
Old 19th October 2017, 07:39 PM
Greg Hyde Greg Hyde is offline
Prolific Member
 
Join Date: Sep 2008
Posts: 4,915
Default

[QUOTE=(though, often, an aircraft will be programmed to have a maintenance check with a repaint following straight after, or vice versa).[/QUOTE]

That would be logical to do the repaint directly after a maintenance check but I suppose the issue is to co-ord the maint.. and paintshop
Reply With Quote
  #119  
Old 20th October 2017, 08:55 AM
Ryan Hothersall's Avatar
Ryan Hothersall Ryan Hothersall is offline
Member
 
Join Date: Mar 2008
Location: Adelaide, South Australia
Posts: 338
Default paint

Back in the days when Qantas did all their maintenance in house, they probably could do that.
__________________
Next Trip

My Stuff on the web
http://www.ryanhothersall.net/
Reply With Quote
  #120  
Old 20th October 2017, 09:25 AM
Zac M's Avatar
Zac M Zac M is offline
Senior Member
 
Join Date: Apr 2008
Location: Canberra
Posts: 1,408
Default

QANTAS still do the huge majority of maintenance in house, painting has not been done in house for some time, not enough work (generally) to keep it running.


Sent from my iPhone using Tapatalk
__________________
Recent Flights:
26/10/24 QF1511 (YQS)
26/10/24 QF1504 (YQS)
26/10/24 QF1503 (YQS)
26/10/24 QF1500 (YQW)
14/10/24 QF1270 (X4A)
11/10/24 JQ655 (VGF)
29/09/24 QF1501 (YQS)
29/09/24 QF1562 (YQS)
Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +10. The time now is 02:11 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright © Sydney Airport Message Board 1997-2022
Use of this web site constitutes acceptance of the Conditions of Use and Privacy Statement